Power Infrastructure renovation for the Head office, including several environment monitoring systems for critical areas.
Power Infrastructure renovation for the Head office, including several environment monitoring systems for critical areas.
Power house : 1 x 800 KVA generator synchronized with existing 2 x 635 KVA + 1 x 250 KVA with fuel tanks room, and remote monitoring and synchronizing of generators, new fuel system and fuel storage room including fire fighting system, double skin stainless steel exhaust up to tower roof.
BCD power house 2 x 450 KVA + 150 KVA generators with remote monitoring and synchronizing.
Headquarters power house: 1 x 350 KVA + 1 x 250 KVA synchronized with remote monitoring and synchronizing of generators with PLC control, synchronizers, room air flow control, sound attenuation, complete automated fuel system with alarms and digital fuel level measurement.
Physical Security for Branches and ATMs including IP CCTV, Intrusion Detection and Fire Alarm detection System, all monitored and controlled from Head office.
Concrete/Cement block factory. Plant rehabilitation, power house, power distribution, load management, MDB, ATS, totalizing panel.
Sin El Fil power house : 2 x 500 KVA + 3 x 400 KVA synchronized generators with PLC control (for load management and load shedding), with remote monitoring and remote control, room air flow control, complete automated fuel system with alarms and fuel level measurement.
Country club with a swimming pool, landscaping, etc. Turnkey job: power and low current.