Category: Commercial

Le Gray Hotel

Turnkey job: Electrical including Bus Bar Trunking power distribution system, all primary and secondary electrical panel boards, lighting, online hospitality access control, Fire Alarm Detection System, IP telephony (EPABX), data networking fiber optics and Cat 6, switching, wireless LAN coverage for the whole premises, IP CCTV, IP interactive television and VoD, music system, public address, […]

PV Ets. Khalil Fattal et Fils

Ets. Fattal et Fils – PV Project

On Grid PV System executed  for HQ Buildings – Dolphin, 565, Salvatories, Building 2252, Pharma, 2170N, 2170S – with a total number of 1056 PV Panels N type (591KWp), bifacial, including export control and integration with load management system.

Credit Libanais Headquarters

32-floor tower with 4-floor annex building and 7 basement floors MEP works in joint-venture with Equip Engineering and Trading.Turnkey job including Power house 4 x 1250 KVA with related sound attenuators, totalizer and exhausts to roof. Power Infrastructure including Medium Voltage Transformers and Switchgear, Bus Bar Trunking, ATS’. Life Safety including Fire Alarm Detection Systems […]

Fransabank Data Center

Turnkey MEP works for Fransabank Data Center located in Hamra. Works include Chillers, CRAHs, Fire Fighting, HVAC, Access Flooring, Racks and Containment, UPS, PDUs, Static Switches, DCIM, BMS, Electrical Panelboards, and Power Distribution Network.

BLF DR Ghazir

  Project: BLF Disaster Recovery Ghazir Name of Employer: Banque Libano Francaise SAL Commencement Date: April 2017 Expected Completion Date: September 2019 Size of Data Center in SQM: 1000 m2, Computer Room(s)/White Space: 350 m2 Size of Data Center in KW: 2×400 KW UPS capacity for IT Load Size of Data Center in Number of […]

Byblos Bank DC

  Project: Byblos Data Center Name of Employer: Byblos Bank SAL Commencement Date: October 2017 Expected Completion Date: October 2018 Size of Data Center in SQM: 1000 m2, Computer Room(s)/White Space: 150 m2 Size of Data Center in KW: 2×144 KW UPS capacity for IT Load Size of Data Center in Number of racks: 28 […]

Credit Libanais Data Center

Turnkey Job as Main Contractor including finishing works, MEP works and Data Center Components and Systems. Data Center designed based on Uptime Institutes’ Tier III criteria for MEP works and TIA942 for Structured cabling works, chilled water cooling system, redundant modular UPS’, raised floor, Data cabinets and Cold Aisle Containment System, Metered and Monitored PDU, […]

Hotel Dieu de France – PV System

On Grid PV System for Hotel Dieu de France – Achrafieh – for buildings (Chanteur Building 157 Panels – Nord Est extension 242 Panels – Pierre Madet 292 panels – Hôpital Du Jour – 332 panels) – Total 1023 Panels

Hôtel-Dieu de France

Building new powerhouse 4x650KVA including all civil works to be interconnected and synchronized with existing 4×1500 KVA generators Replacement of 1500 KVA generators by new ones

Central Bank of Lebanon (BDL)

Power house : 4 x 1250 KVA generators installation and synchronization systems, remote radiator and cooling towers, fuel tanks with automatic fuel system, sound proofing, totalizing and distribution panel boards, 16 x 1600 Amp ATS, power and energy recording system for historical power analysis, PLC for load management and load shedding, etc…