BLF DR Ghazir

 

Project: BLF Disaster Recovery Ghazir
Name of Employer: Banque Libano Francaise SAL
Commencement Date: April 2017
Expected Completion Date: September 2019
Size of Data Center in SQM: 1000 m2, Computer Room(s)/White Space: 350 m2
Size of Data Center in KW: 2×400 KW UPS capacity for IT Load
Size of Data Center in Number of racks: Phase 1 – 48 racks (Infrastructure support for 100 racks)
Design Criteria: Uptime Institute’s Tier III requirements with Continuous Cooling.


(Design Certified by Uptime Institute).
Electrical, Data Center Components, DCIM: POTEL SAL.
Name of the Consultant: Barbanel

  • Data Centers